MEA Project Open House: Fishhook to Pittman Transmission Line Route & Substation Siting Study
Join MEA for their second Open House on the Fishhook to Pittman Power Improvement Study which includes identifying a route for a transmission line and sites for two substations to support the growing power load for homes and businesses in the study area. With your feedback and comments we have evaluated initial route options. Information at the Open House will include:
-Data used to map and develop the preferred routes for a new transmission line to supply power to the growing Fishhook to Meadow Lakes areas.
-Maps of the study's preferred and alternate power line routes.
-Progress on identifying sites for two substations to support growling load for homes and businesses in the study area. We hope you can join us as member feedback is crucial to the project and we greatly value your input.
Stop by Tanaina Elementary School (2550 Lucille St.) anytime between 6:00 p.m. and 8:30 p.m. on Wednesday, September 29, 2021. Masks may be required on the school premises per MSBSD policy.